Welding Alloys Arya Consent Letter – Khuzestan Steel Project

Welding Alloys Arya | Ref. 1-93-020 | 1 Feb 2015
Consent Letters

Welding Alloys Arya Consent Letter – Khuzestan Steel Project

Welding Alloys Arya | Ref. 1-93-020 | 1 Feb 2015

Welding Alloys Arya's satisfaction with the equipment built by Masab Pouya for the Khuzestan Steel direct-reduction steel line.

With this letter, Welding Alloys Arya confirms its satisfaction with the equipment manufacturing projects for the direct-reduction steel production line of Khuzestan Steel. All units were built by Masab Pouya on schedule and in full compliance with the technical specifications and standards of Welding Alloys and the main client. Items built: Charge Hopper Lower Part (1 unit) – 2012.